Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
PET/SPECT Radiopharmacy Morning Dose Draw Hub
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
75 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.01 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.21%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Dose Calibrator Decay Draw
244 < 360/day
Limit: downtime
Dose Calibrator Decay Draw: capacity 244/day vs demand 360/day. Main limit: downtime. Raw C/T 80 s, effective C/T 98 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€297,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
128.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Mo-99 Generators & Cy…
Lead Shielded Unit Doses
Daily Pharma · LT 1d
PRODUCTION CONTROL / ERP
HotLab Track
FIFO Batch Autoclave
CUSTOMER
City Nuclear Imaging …
360 vials/d
Takt: 75 s
EDI / Hourly Carts
MRP / Daily Pharma
★ PACEMAKER
IN
Insert a step at the start
+
I
288
0.80 d
Drag to reorder step 1
DECONTAM/RX
1. Hot-Cell Moly Ge…
×3
FIFO Lane
C/T
50 s
C/O
10 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
144 / 1d
OEE
88.7%
i
FIFO
Insert a step here
+
I
396
1.10 d
Drag to reorder step 2
PREP CLEAN
2. Kit Tagging & Ra…
×3
Push Flow
C/T
61 s
C/O
15 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
144 / 1d
OEE
83.7%
i
Insert a step here
+
I
540
1.50 d
KANBAN
Standardi…
Drag to reorder step 3
STERILE ZONE
3. Dose Calibrator …
×2
BOTTLENECK
C/T
80 s
C/O
25 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
180 / 1d
OEE
72.4%
i
Insert a step here
+
I
216
0.60 d
Drag to reorder step 4
QUALITY GATE
4. Lead Pig Shield …
×2
FIFO Lane
C/T
54 s
C/O
6 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
72 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
180
0.50 d
Drag to reorder step 5
WARD DROP
5. Timed 6AM Hospit…
×2
Continuous Flow
C/T
41 s
C/O
5 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
72 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
180
0.50 d
Finished Goods
OUT
0.80 d
VA 50 s
1.10 d
VA 61 s
1.50 d
VA 80 s
0.60 d
VA 54 s
0.50 d
VA 41 s
0.50 d
Total Lead Time
5.01 d
VA Time
4.8 min
PCE
0.21%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step