Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
OEB-5 High-Potency Contained Oncology Tablet
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
16 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Contained Rotary Tablet Press
10,120 < 14,000/day
Limit: downtime
Contained Rotary Tablet Press: capacity 10,120/day vs demand 14,000/day. Main limit: downtime. Raw C/T 4.1 s, effective C/T 5.1 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,712,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,803.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
HPAPI Suppliers
Cytotoxic Micronized Po…
Weekly · LT 6d
PRODUCTION CONTROL / ERP
MES
Campaign Compression Push
CUSTOMER
Specialty Oncology Ho…
14,000 units/d
Takt: 3.9 s
EDI / Daily Pharma
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
22,400
1.60 d
Drag to reorder step 1
OSD ZONE 1
1. Isolator Contain…
×2
Push Flow
C/T
2.8 s
C/O
45 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
21000 / 2d
OEE
90.0%
i
Insert a step here
+
I
25,200
1.80 d
Drag to reorder step 2
COMPRESSION
2. Contained Roller…
×2
Push Flow
C/T
3.2 s
C/O
75 min
Availability
89%
Quality FPY
97.6%
Batch / EPEI
21000 / 2d
OEE
82.0%
i
Insert a step here
+
I
29,400
2.10 d
SMED
SMED Wash…
Drag to reorder step 3
COATING BAY
3. Contained Rotary…
×2
BOTTLENECK
C/T
4.1 s
C/O
65 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
21000 / 2d
OEE
76.8%
i
Insert a step here
+
I
16,800
1.20 d
Drag to reorder step 4
BLISTER LINE
4. Dedicated Wash-I…
×2
FIFO Lane
C/T
3.0 s
C/O
35 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
11200 / 2d
OEE
85.0%
i
FIFO
Insert a step here
+
I
19,600
1.40 d
Drag to reorder step 5
SECONDARY/QA
5. Bottle Induction…
×2
FIFO Lane
C/T
2.4 s
C/O
15 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
7000 / 1d
OEE
91.3%
i
Insert a step at the end
+
I
25,200
1.80 d
Finished Goods
OUT
1.60 d
VA 2.8 s
1.80 d
VA 3.2 s
2.10 d
VA 4.1 s
1.20 d
VA 3.0 s
1.40 d
VA 2.4 s
1.80 d
Total Lead Time
9.90 d
VA Time
16 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step