Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Preservative-Free Ophthalmic Eye Dropper
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.9 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Isolator Bottle & Tip Press
14,053 < 22,000/day
Limit: downtime
Isolator Bottle & Tip Press: capacity 14,053/day vs demand 22,000/day. Main limit: downtime. Raw C/T 2.7 s, effective C/T 3.4 s.
Quality (RTY)
90.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€905,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,549.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Ophthalmic Tip Suppli…
Gamma-Sterile LDPE Bott…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
Campaign EBR Release Push
CUSTOMER
Retail Pharmacies
22,000 vials/d
Takt: 2.5 s
EDI / Daily GDP
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
30,800
1.40 d
Drag to reorder step 1
CLEANROOM B
1. Sterile Micro-Fi…
×2
Push Flow
C/T
1.7 s
C/O
45 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
22000 / 2d
OEE
89.7%
i
Insert a step here
+
I
48,400
2.20 d
SMED
SMED Isol…
Drag to reorder step 2
ISOLATOR A
2. Isolator Bottle …
×3
BOTTLENECK
C/T
2.7 s
C/O
95 min
Availability
82%
Quality FPY
95.8%
Batch / EPEI
22000 / 3d
OEE
70.3%
i
Insert a step here
+
I
28,600
1.30 d
Drag to reorder step 3
INSPECTION
3. Torque Capping &…
×2
FIFO Lane
C/T
1.9 s
C/O
25 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
11000 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
22,000
1.00 d
Drag to reorder step 4
SECONDARY PACK
4. Induction Seal &…
×2
FIFO Lane
C/T
1.6 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
8800 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
52,800
2.40 d
Drag to reorder step 5
QA REGULATORY
5. Carton Insert & …
×2
Push Flow
C/T
2.0 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
22000 / 2d
OEE
90.6%
i
Insert a step at the end
+
I
33,000
1.50 d
Finished Goods
OUT
1.40 d
VA 1.7 s
2.20 d
VA 2.7 s
1.30 d
VA 1.9 s
1.00 d
VA 1.6 s
2.40 d
VA 2.0 s
1.50 d
Total Lead Time
9.80 d
VA Time
9.9 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step