Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
4-Lane Aluminum Foil Stick-Pack Powder Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
0.6 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ultrasonic Tear-Notch Seal
34,577 < 95,000/day
Limit: downtime
Ultrasonic Tear-Notch Seal: capacity 34,577/day vs demand 95,000/day. Main limit: downtime. Raw C/T 1.2 s, effective C/T 1.5 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€300,960
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
12,239.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Barrier Foil Supplier
Alu-PE Stick-Pack Lamin…
Weekly · LT 6d
PRODUCTION CONTROL / ERP
ERP
Campaign Compression Push
CUSTOMER
OTC Consumer Health
95,000 packs/d
Takt: 0.6 s
EDI / Daily Pharma
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
152,000
1.60 d
Drag to reorder step 1
OSD ZONE 1
1. V-Blender Homoge…
×2
Push Flow
C/T
1.2 s
C/O
45 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
142500 / 2d
OEE
90.0%
i
Insert a step here
+
I
171,000
1.80 d
Drag to reorder step 2
COMPRESSION
2. 4-Lane Servo Aug…
×2
Push Flow
C/T
1.2 s
C/O
75 min
Availability
89%
Quality FPY
97.6%
Batch / EPEI
142500 / 2d
OEE
82.0%
i
Insert a step here
+
I
199,500
2.10 d
SMED
SMED Wash…
Drag to reorder step 3
COATING BAY
3. Ultrasonic Tear-…
×2
BOTTLENECK
C/T
1.2 s
C/O
65 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
142500 / 2d
OEE
76.8%
i
Insert a step here
+
I
114,000
1.20 d
Drag to reorder step 4
BLISTER LINE
4. Inline Weight & …
×2
FIFO Lane
C/T
1.2 s
C/O
35 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
76000 / 2d
OEE
85.0%
i
FIFO
Insert a step here
+
I
133,000
1.40 d
Drag to reorder step 5
SECONDARY/QA
5. Auto Stick Carto…
×2
FIFO Lane
C/T
1.2 s
C/O
15 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
47500 / 1d
OEE
91.3%
i
Insert a step at the end
+
I
171,000
1.80 d
Finished Goods
OUT
1.60 d
VA 1.2 s
1.80 d
VA 1.2 s
2.10 d
VA 1.2 s
1.20 d
VA 1.2 s
1.40 d
VA 1.2 s
1.80 d
Total Lead Time
9.90 d
VA Time
6.0 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step