Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.4 s
Lead Time (LT)
9.90 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckTumble & 36h Tunnel Drying
52,740 < 210,000/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€228,690
Carbon CO₂
27,054.7 t CO₂e/year