Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.8 s
Lead Time (LT)
9.90 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckRecirculating Heated Volumetric
34,577 < 64,000/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€158,400
Carbon CO₂
8,245.2 t CO₂e/year