Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Neonatal ICU Parenteral Nutrition (TPN) Compounding
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.06 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.79%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Filter Integrity & Visual Scan
64 < 95/day
Limit: downtime
Filter Integrity & Visual Scan: capacity 64/day vs demand 95/day. Main limit: downtime. Raw C/T 5.1 min, effective C/T 6.2 min.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€52,470
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
33.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Parenteral Amino, Lip…
3L Dual-Chamber EVA Bags
Daily Pharma · LT 1d
PRODUCTION CONTROL / ERP
TPN Compounder
FIFO Batch Autoclave
CUSTOMER
NICU & ICU Beds
95 packs/d
Takt: 4.7 min
EDI / Hourly Carts
MRP / Daily Pharma
★ PACEMAKER
IN
Insert a step at the start
+
I
76
0.80 d
Drag to reorder step 1
DECONTAM/RX
1. Dietitian Electr…
×3
FIFO Lane
C/T
3.1 min
C/O
10 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
38 / 1d
OEE
88.7%
i
FIFO
Insert a step here
+
I
105
1.11 d
Drag to reorder step 2
PREP CLEAN
2. 12-Channel Gravi…
×3
Push Flow
C/T
3.9 min
C/O
15 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
38 / 1d
OEE
83.7%
i
Insert a step here
+
I
143
1.51 d
KANBAN
Standardi…
Drag to reorder step 3
STERILE ZONE
3. Filter Integrity…
×2
BOTTLENECK
C/T
5.1 min
C/O
25 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
48 / 1d
OEE
72.5%
i
Insert a step here
+
I
57
0.60 d
Drag to reorder step 4
QUALITY GATE
4. Light-Protective…
×2
FIFO Lane
C/T
3.4 min
C/O
6 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
19 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
48
0.51 d
Drag to reorder step 5
WARD DROP
5. Refrigerated NIC…
×2
Continuous Flow
C/T
2.6 min
C/O
5 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
19 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
48
0.51 d
Finished Goods
OUT
0.80 d
VA 3.1 min
1.11 d
VA 3.9 min
1.51 d
VA 5.1 min
0.60 d
VA 3.4 min
0.51 d
VA 2.6 min
0.51 d
Total Lead Time
5.06 d
VA Time
18.1 min
PCE
0.79%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step