Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Widebody Freighter Air Cargo ULD Ground Hub
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.82 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
27.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Customs & ETD Explosive Trace
128 < 190/day
Limit: downtime
Customs & ETD Explosive Trace: capacity 128/day vs demand 190/day. Main limit: downtime. Raw C/T 7.7 min, effective C/T 10.2 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€563,160
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
426.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cargo Airline Ramp Fl…
Inbound Mixed Freight U…
Daily Vessel · LT 3d
PRODUCTION CONTROL / ERP
Air Cargo ERP
Physical Hold Before Pre-Clearance
CUSTOMER
Air Express Forwarders
190 TEU/d
Takt: 7.1 min
EDI / 24/7 Gate Slots
MRP / Daily Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
190
1.00 d
Drag to reorder step 1
APRON/QUAY
1. Main-Deck Loader…
×2
FIFO Lane
C/T
4.8 min
C/O
15 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
95 / 1d
OEE
90.1%
i
FIFO
Insert a step here
+
I
380
2.00 d
Drag to reorder step 2
TERMINAL YARD
2. Bonded Cage Brea…
×3
Push Flow
C/T
5.6 min
C/O
10 min
Availability
91%
Quality FPY
98.4%
Batch / EPEI
76 / 1d
OEE
87.9%
i
Insert a step here
+
I
494
2.60 d
FLOW
Pre-Arriv…
Drag to reorder step 3
CUSTOMS LANE
3. Customs & ETD Ex…
×4
BOTTLENECK
C/T
7.7 min
C/O
25 min
Availability
82%
Quality FPY
92.0%
Batch / EPEI
95 / 1d
OEE
72.6%
i
Insert a step here
+
I
171
0.90 d
Drag to reorder step 4
YARD TRANSFER
4. Re-Weigh & Forwa…
×2
FIFO Lane
C/T
5.3 min
C/O
8 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
38 / 1d
OEE
89.0%
i
FIFO
Insert a step here
+
I
95
0.50 d
Drag to reorder step 5
INLAND GATE
5. Drayage Dock Tru…
×2
Continuous Flow
C/T
4.0 min
C/O
5 min
Availability
97%
Quality FPY
98.6%
Batch / EPEI
29 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
152
0.80 d
Finished Goods
OUT
1.00 d
VA 4.8 min
2.00 d
VA 5.6 min
2.60 d
VA 7.7 min
0.90 d
VA 5.3 min
0.50 d
VA 4.0 min
0.80 d
Total Lead Time
7.82 d
VA Time
27.3 min
PCE
0.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step