Free-Trade Zone Bonded Deconsolidation Hub
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Value-Add Kitting & Label
277 < 420/day
Limit: downtime
Value-Add Kitting & Label: capacity 277/day vs demand 420/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 3.1 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€311,220
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
943.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
FCL Import Containers
Multi-Consignee Pallets
Daily Vessel · LT 3d
PRODUCTION CONTROL / ERP
FTZ Customs WMS
Physical Hold Before Pre-Clearance
CUSTOMER
Regional Export Marke…
420 crates/d
Takt: 2.1 min
EDI / 24/7 Gate Slots
MRP / Daily Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
420
1.00 d
Drag to reorder step 1
APRON/QUAY
1. Bonded Container…
×2
FIFO Lane
C/T
87 s
C/O
15 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
210 / 1d
OEE
89.1%
i
FIFO
Insert a step here
+
I
840
2.00 d
Drag to reorder step 2
TERMINAL YARD
2. Item Tally & HS …
×3
Push Flow
C/T
100 s
C/O
10 min
Availability
91%
Quality FPY
98.4%
Batch / EPEI
168 / 1d
OEE
87.1%
i
Insert a step here
+
I
1,092
2.60 d
FLOW
Pre-Arriv…
Drag to reorder step 3
CUSTOMS LANE
3. Value-Add Kittin…
×4
BOTTLENECK
C/T
2.3 min
C/O
25 min
Availability
82%
Quality FPY
92.0%
Batch / EPEI
210 / 1d
OEE
71.2%
i
Insert a step here
+
I
378
0.90 d
Drag to reorder step 4
YARD TRANSFER
4. Export T1 / Bill…
×2
FIFO Lane
C/T
95 s
C/O
8 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
84 / 1d
OEE
87.7%
i
FIFO
Insert a step here
+
I
210
0.50 d
Drag to reorder step 5
INLAND GATE
5. FCL Re-Stuff & F…
×2
Continuous Flow
C/T
72 s
C/O
5 min
Availability
97%
Quality FPY
98.6%
Batch / EPEI
63 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
336
0.80 d
Finished Goods
OUT
1.00 d
VA 87 s
2.00 d
VA 100 s
2.60 d
VA 2.3 min
0.90 d
VA 95 s
0.50 d
VA 72 s
0.80 d
Total Lead Time
7.81 d
VA Time
8.2 min
PCE
0.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen