Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Frequency Strait Ro-Pax Freight Ferry
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Weight-Balanced Deck Lane Load
323 < 480/day
Limit: downtime
Weight-Balanced Deck Lane Load: capacity 323/day vs demand 480/day. Main limit: downtime. Raw C/T 3.0 min, effective C/T 4.0 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€329,472
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,078.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
International Road Ha…
Accompanied Reefers & T…
Daily Vessel · LT 3d
PRODUCTION CONTROL / ERP
FerryPort ERP
Physical Hold Before Pre-Clearance
CUSTOMER
Cross-Strait Highway …
480 TEU/d
Takt: 2.8 min
EDI / 24/7 Gate Slots
MRP / Daily Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
480
1.00 d
Drag to reorder step 1
APRON/QUAY
1. Check-In & Custo…
×2
FIFO Lane
C/T
115 s
C/O
15 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
240 / 1d
OEE
90.1%
i
FIFO
Insert a step here
+
I
960
2.00 d
Drag to reorder step 2
TERMINAL YARD
2. Security K9 / X-…
×3
Push Flow
C/T
2.2 min
C/O
10 min
Availability
91%
Quality FPY
98.4%
Batch / EPEI
192 / 1d
OEE
87.9%
i
Insert a step here
+
I
1,248
2.60 d
FLOW
Pre-Arriv…
Drag to reorder step 3
CUSTOMS LANE
3. Weight-Balanced …
×4
BOTTLENECK
C/T
3.0 min
C/O
25 min
Availability
82%
Quality FPY
92.0%
Batch / EPEI
240 / 1d
OEE
72.6%
i
Insert a step here
+
I
432
0.90 d
Drag to reorder step 4
YARD TRANSFER
4. Strait Crossing …
×2
FIFO Lane
C/T
2.1 min
C/O
8 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
96 / 1d
OEE
89.0%
i
FIFO
Insert a step here
+
I
240
0.50 d
Drag to reorder step 5
INLAND GATE
5. Express Port Exi…
×2
Continuous Flow
C/T
95 s
C/O
5 min
Availability
97%
Quality FPY
98.6%
Batch / EPEI
72 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
384
0.80 d
Finished Goods
OUT
1.00 d
VA 115 s
2.00 d
VA 2.2 min
2.60 d
VA 3.0 min
0.90 d
VA 2.1 min
0.50 d
VA 95 s
0.80 d
Total Lead Time
7.81 d
VA Time
10.8 min
PCE
0.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step