Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
37.5 min
Lead Time (LT)
7.91 d
Value-Added
2.4 h
Efficiency (PCE)
1.35%
BottleneckShore-Tank Composite Lab QC
24 < 36/day
Limit: downtime
Quality (RTY)
86.3%
WIP Capital
€407,450
Carbon CO₂
80.9 t CO₂e/year