Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dedicated Fruit Terminal Reefer Pallet Discharge
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Airlock Cool-Chamber Buffer
631 < 950/day
Limit: downtime
Airlock Cool-Chamber Buffer: capacity 631/day vs demand 950/day. Main limit: downtime. Raw C/T 61 s, effective C/T 81 s.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€385,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,134.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Reefer Fruit Charter …
Pre-Palletized Pineappl…
Daily Vessel · LT 3d
PRODUCTION CONTROL / ERP
ReeferPort ERP
Physical Hold Before Pre-Clearance
CUSTOMER
European Wholesale Ma…
950 crates/d
Takt: 57 s
EDI / 24/7 Gate Slots
MRP / Daily Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
950
1.00 d
Drag to reorder step 1
APRON/QUAY
1. Crane Cage Reefe…
×2
FIFO Lane
C/T
39 s
C/O
15 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
475 / 1d
OEE
89.1%
i
FIFO
Insert a step here
+
I
1,900
2.00 d
Drag to reorder step 2
TERMINAL YARD
2. Pulp Temp & Agri…
×3
Push Flow
C/T
44 s
C/O
10 min
Availability
91%
Quality FPY
98.4%
Batch / EPEI
380 / 1d
OEE
87.1%
i
Insert a step here
+
I
2,470
2.60 d
FLOW
Pre-Arriv…
Drag to reorder step 3
CUSTOMS LANE
3. Airlock Cool-Cha…
×4
BOTTLENECK
C/T
61 s
C/O
25 min
Availability
82%
Quality FPY
92.0%
Batch / EPEI
475 / 1d
OEE
71.2%
i
Insert a step here
+
I
855
0.90 d
Drag to reorder step 4
YARD TRANSFER
4. Market Order Cro…
×2
FIFO Lane
C/T
42 s
C/O
8 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
190 / 1d
OEE
87.7%
i
FIFO
Insert a step here
+
I
475
0.50 d
Drag to reorder step 5
INLAND GATE
5. Curtain Reefer S…
×2
Continuous Flow
C/T
32 s
C/O
5 min
Availability
97%
Quality FPY
98.6%
Batch / EPEI
143 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
760
0.80 d
Finished Goods
OUT
1.00 d
VA 39 s
2.00 d
VA 44 s
2.60 d
VA 61 s
0.90 d
VA 42 s
0.50 d
VA 32 s
0.80 d
Total Lead Time
7.80 d
VA Time
3.6 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step