Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Speed 2-Piece Aluminum Beverage Can Deco
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
0.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
8-Color Dry Offset Decorator
51,487 < 240,000/day
Limit: downtime
8-Color Dry Offset Decorator: capacity 51,487/day vs demand 240,000/day. Main limit: downtime. Raw C/T 1.2 s, effective C/T 1.5 s.
Quality (RTY)
89.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€68,880
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
25,470.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Al Coil Stock 3104 Al…
UV Curable Overprint Va…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
CanPlant MES
CMYK Press Queue Push
CUSTOMER
Global Beverage Fille…
240,000 units/d
Takt: 0.3 s
EDI / Daily Roll Pallet
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
336,000
1.40 d
Drag to reorder step 1
PREPRESS
1. Cup & Wall Irone…
×2
Push Flow
C/T
1.2 s
C/O
20 min
Availability
96%
Quality FPY
98.2%
Batch / EPEI
192000 / 1d
OEE
92.5%
i
Insert a step here
+
I
480,000
2.00 d
SMED
Sleeve In…
Drag to reorder step 2
PRESS HALL
2. 8-Color Dry Offs…
×2
BOTTLENECK
C/T
1.2 s
C/O
65 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
240000 / 2d
OEE
76.3%
i
Insert a step here
+
I
360,000
1.50 d
Drag to reorder step 3
LAMINATING
3. Pin-Chain Gas Cu…
×2
Push Flow
C/T
1.2 s
C/O
30 min
Availability
91%
Quality FPY
97.8%
Batch / EPEI
192000 / 2d
OEE
86.5%
i
Insert a step here
+
I
240,000
1.00 d
Drag to reorder step 4
SLIT/INSPECT
4. Necking Spin & F…
×2
FIFO Lane
C/T
1.2 s
C/O
15 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
96000 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
192,000
0.80 d
Drag to reorder step 5
DISPATCH
5. 100% Vision Ligh…
×1
FIFO Lane
C/T
1.2 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
72000 / 1d
OEE
94.5%
i
Insert a step at the end
+
I
360,000
1.50 d
Finished Goods
OUT
1.40 d
VA 1.2 s
2.00 d
VA 1.2 s
1.50 d
VA 1.2 s
1.00 d
VA 1.2 s
0.80 d
VA 1.2 s
1.50 d
Total Lead Time
8.20 d
VA Time
6.0 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step