Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.7 s
Lead Time (LT)
8.20 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckHigh-Speed Gravure Solvent Dry
51,487 < 120,000/day
Limit: downtime
Quality (RTY)
89.7%
WIP Capital
€44,280
Carbon CO₂
12,735.4 t CO₂e/year