Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.8 s
Lead Time (LT)
8.20 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
Bottleneck6-Color Water-Based Print
33,457 < 65,000/day
Limit: downtime
Quality (RTY)
89.7%
WIP Capital
€63,960
Carbon CO₂
6,898.3 t CO₂e/year