Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hospital-Linked Newborn Birth Certificate & ID
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.32 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.24%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Registrar Cross-Border Verify
115 < 180/day
Limit: downtime
Registrar Cross-Border Verify: capacity 115/day vs demand 180/day. Main limit: downtime. Raw C/T 2.7 min, effective C/T 3.5 min.
Quality (RTY)
71.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€20,916
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Maternity Hospital Bi…
MD Delivery Notice & Pa…
Continuous Public · LT 2d
PRODUCTION CONTROL / ERP
CivilRegistry
Paper Backlog Silo Queue
CUSTOMER
New Parents & Health …
180 files/d
Takt: 2.5 min
EDI / Pickup / Mail
MRP / Continuous Public
★ PACEMAKER
IN
Insert a step at the start
+
I
252
1.40 d
Drag to reorder step 1
FRONT COUNTER
1. Maternity E-Noti…
×3
FIFO Lane
C/T
93 s
C/O
5 min
Availability
97%
Quality FPY
89.5%
Batch / EPEI
36 / 1d
OEE
82.0%
i
FIFO
Insert a step here
+
I
324
1.80 d
Drag to reorder step 2
CLERK DESK
2. Parent Online Na…
×3
Push Flow
C/T
117 s
C/O
6 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
36 / 1d
OEE
81.2%
i
Insert a step here
+
I
612
3.40 d
AUTOMATION
Inter-Min…
Drag to reorder step 3
CASE OFFICER
3. Registrar Cross-…
×4
BOTTLENECK
C/T
2.7 min
C/O
12 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
45 / 1d
OEE
68.4%
i
Insert a step here
+
I
162
0.90 d
Drag to reorder step 4
ISSUANCE
4. Tax ID & Health …
×2
FIFO Lane
C/T
102 s
C/O
4 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
85.4%
i
FIFO
Insert a step here
+
I
72
0.40 d
Drag to reorder step 5
PICKUP DESK
5. Digital Signed C…
×2
Continuous Flow
C/T
72 s
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
18 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
72
0.40 d
Finished Goods
OUT
1.40 d
VA 93 s
1.80 d
VA 117 s
3.40 d
VA 2.7 min
0.90 d
VA 102 s
0.40 d
VA 72 s
0.40 d
Total Lead Time
8.32 d
VA Time
9.1 min
PCE
0.24%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step