Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Digital Driver’s License Theory, Road Test & Card
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.31 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.09%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Registry Fraud Hold Verification
308 < 480/day
Limit: downtime
Registry Fraud Hold Verification: capacity 308/day vs demand 480/day. Main limit: downtime. Raw C/T 60 s, effective C/T 78 s.
Quality (RTY)
71.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€127,488
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
18.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Driving Schools & Med…
Eye Exam & Bio Signatur…
Continuous Public · LT 2d
PRODUCTION CONTROL / ERP
Licensing Authority Cloud ERP
Paper Backlog Silo Queue
CUSTOMER
New Licensed Drivers
480 files/d
Takt: 56 s
EDI / Pickup / Mail
MRP / Continuous Public
★ PACEMAKER
IN
Insert a step at the start
+
I
672
1.40 d
Drag to reorder step 1
FRONT COUNTER
1. Medical & Theory…
×3
FIFO Lane
C/T
35 s
C/O
5 min
Availability
97%
Quality FPY
89.5%
Batch / EPEI
96 / 1d
OEE
82.0%
i
FIFO
Insert a step here
+
I
864
1.80 d
Drag to reorder step 2
CLERK DESK
2. Examiner Road Te…
×3
Push Flow
C/T
44 s
C/O
6 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
96 / 1d
OEE
81.2%
i
Insert a step here
+
I
1,632
3.40 d
AUTOMATION
Inter-Min…
Drag to reorder step 3
CASE OFFICER
3. Registry Fraud H…
×4
BOTTLENECK
C/T
60 s
C/O
12 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
120 / 1d
OEE
68.4%
i
Insert a step here
+
I
432
0.90 d
Drag to reorder step 4
ISSUANCE
4. UV Card Laser Pr…
×2
FIFO Lane
C/T
38 s
C/O
4 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
48 / 1d
OEE
85.4%
i
FIFO
Insert a step here
+
I
192
0.40 d
Drag to reorder step 5
PICKUP DESK
5. Tracked Post Car…
×2
Continuous Flow
C/T
27 s
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
48 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
192
0.40 d
Finished Goods
OUT
1.40 d
VA 35 s
1.80 d
VA 44 s
3.40 d
VA 60 s
0.90 d
VA 38 s
0.40 d
VA 27 s
0.40 d
Total Lead Time
8.31 d
VA Time
3.4 min
PCE
0.09%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step