Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial Venue Fire-Marshal Safety Inspection
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.42 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
38.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Deficiency 14-Day Re-Check
27 < 42/day
Limit: downtime
Deficiency 14-Day Re-Check: capacity 27/day vs demand 42/day. Main limit: downtime. Raw C/T 11.5 min, effective C/T 15.0 min.
Quality (RTY)
71.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€57,750
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Malls, Hotels & Night…
Sprinkler & Alarm Certs
Continuous Public · LT 2d
PRODUCTION CONTROL / ERP
FireMarshal ERP
Paper Backlog Silo Queue
CUSTOMER
City Safety Permitting
42 cases/d
Takt: 10.7 min
EDI / Pickup / Mail
MRP / Continuous Public
★ PACEMAKER
IN
Insert a step at the start
+
I
59
1.40 d
Drag to reorder step 1
FRONT COUNTER
1. Self-Cert Alarm …
×3
FIFO Lane
C/T
6.7 min
C/O
5 min
Availability
97%
Quality FPY
89.5%
Batch / EPEI
8 / 1d
OEE
81.8%
i
FIFO
Insert a step here
+
I
76
1.81 d
Drag to reorder step 2
CLERK DESK
2. Inspector On-Sit…
×3
Push Flow
C/T
8.4 min
C/O
6 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
8 / 1d
OEE
80.9%
i
Insert a step here
+
I
143
3.40 d
AUTOMATION
Inter-Min…
Drag to reorder step 3
CASE OFFICER
3. Deficiency 14-Da…
×4
BOTTLENECK
C/T
11.5 min
C/O
12 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
11 / 1d
OEE
68.7%
i
Insert a step here
+
I
38
0.90 d
Drag to reorder step 4
ISSUANCE
4. QR Capacity Plac…
×2
FIFO Lane
C/T
7.3 min
C/O
4 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
85.0%
i
FIFO
Insert a step here
+
I
17
0.40 d
Drag to reorder step 5
PICKUP DESK
5. Portal Public Re…
×2
Continuous Flow
C/T
5.2 min
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
4 / 1d
OEE
93.6%
i
Insert a step at the end
+
I
17
0.40 d
Finished Goods
OUT
1.40 d
VA 6.7 min
1.81 d
VA 8.4 min
3.40 d
VA 11.5 min
0.90 d
VA 7.3 min
0.40 d
VA 5.2 min
0.40 d
Total Lead Time
8.42 d
VA Time
38.9 min
PCE
1.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step