Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Municipal Restaurant Hygiene Rating Inspection
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.35 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.51%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Supervisor Re-Grade Critical
54 < 85/day
Limit: downtime
Supervisor Re-Grade Critical: capacity 54/day vs demand 85/day. Main limit: downtime. Raw C/T 5.7 min, effective C/T 7.4 min.
Quality (RTY)
71.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€67,070
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Urban Restaurants & M…
HACCP Temp & Clean Logs
Continuous Public · LT 2d
PRODUCTION CONTROL / ERP
HealthGov ERP
Paper Backlog Silo Queue
CUSTOMER
Public Transparency P…
85 cases/d
Takt: 5.3 min
EDI / Pickup / Mail
MRP / Continuous Public
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
FRONT COUNTER
1. Risk-Interval Un…
×3
FIFO Lane
C/T
3.3 min
C/O
5 min
Availability
97%
Quality FPY
89.5%
Batch / EPEI
17 / 1d
OEE
82.0%
i
FIFO
Insert a step here
+
I
153
1.80 d
Drag to reorder step 2
CLERK DESK
2. Cold-Chain Temp …
×3
Push Flow
C/T
4.1 min
C/O
6 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
17 / 1d
OEE
81.2%
i
Insert a step here
+
I
289
3.40 d
AUTOMATION
Inter-Min…
Drag to reorder step 3
CASE OFFICER
3. Supervisor Re-Gr…
×4
BOTTLENECK
C/T
5.7 min
C/O
12 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
21 / 1d
OEE
68.3%
i
Insert a step here
+
I
77
0.91 d
Drag to reorder step 4
ISSUANCE
4. Digital Window G…
×2
FIFO Lane
C/T
3.6 min
C/O
4 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
9 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
34
0.40 d
Drag to reorder step 5
PICKUP DESK
5. Open-Data Hygien…
×2
Continuous Flow
C/T
2.5 min
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
9 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
34
0.40 d
Finished Goods
OUT
1.40 d
VA 3.3 min
1.80 d
VA 4.1 min
3.40 d
VA 5.7 min
0.91 d
VA 3.6 min
0.40 d
VA 2.5 min
0.40 d
Total Lead Time
8.35 d
VA Time
19.2 min
PCE
0.51%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step