Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Multi-Lane Vehicle Roadworthiness Test
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
71 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.31 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.11%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Roller Brake & Suspension Rig
243 < 380/day
Limit: downtime
Roller Brake & Suspension Rig: capacity 243/day vs demand 380/day. Main limit: downtime. Raw C/T 76 s, effective C/T 99 s.
Quality (RTY)
71.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€56,772
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Private & Taxi Vehicl…
OBD-II & Registration T…
Continuous Public · LT 2d
PRODUCTION CONTROL / ERP
InspectStation ERP
Paper Backlog Silo Queue
CUSTOMER
Vehicle Owners
380 units/d
Takt: 71 s
EDI / Pickup / Mail
MRP / Continuous Public
★ PACEMAKER
IN
Insert a step at the start
+
I
532
1.40 d
Drag to reorder step 1
FRONT COUNTER
1. ANPR Plate Check…
×3
FIFO Lane
C/T
44 s
C/O
5 min
Availability
97%
Quality FPY
89.5%
Batch / EPEI
76 / 1d
OEE
82.0%
i
FIFO
Insert a step here
+
I
684
1.80 d
Drag to reorder step 2
CLERK DESK
2. OBD-II & Opacity…
×3
Push Flow
C/T
55 s
C/O
6 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
76 / 1d
OEE
81.2%
i
Insert a step here
+
I
1,292
3.40 d
AUTOMATION
Inter-Min…
Drag to reorder step 3
CASE OFFICER
3. Roller Brake & S…
×4
BOTTLENECK
C/T
76 s
C/O
12 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
95 / 1d
OEE
68.4%
i
Insert a step here
+
I
342
0.90 d
Drag to reorder step 4
ISSUANCE
4. Under-Chassis Pl…
×2
FIFO Lane
C/T
48 s
C/O
4 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
38 / 1d
OEE
85.4%
i
FIFO
Insert a step here
+
I
152
0.40 d
Drag to reorder step 5
PICKUP DESK
5. Windshield Stick…
×2
Continuous Flow
C/T
34 s
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
38 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
152
0.40 d
Finished Goods
OUT
1.40 d
VA 44 s
1.80 d
VA 55 s
3.40 d
VA 76 s
0.90 d
VA 48 s
0.40 d
VA 34 s
0.40 d
Total Lead Time
8.31 d
VA Time
4.3 min
PCE
0.11%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step