Pre-Demolition Hazardous Asbestos Abatement Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.57 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.33%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Sealed Poly Containment Tent
6 < 10/day
Limit: changeovers
Sealed Poly Containment Tent: capacity 6/day vs demand 10/day. Main limit: changeovers. Raw C/T 48.2 min, effective C/T 1.1 h.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€262,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Accredited Asbestos L…
HEPA Negative Air Units
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
HazAbate ERP
Back-and-Forth RFI Revision
CUSTOMER
Urban Redevelopment S…
10 cases/d
Takt: 45.0 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
15
1.50 d
Drag to reorder step 1
INTAKE DESK
1. Bulk Material La…
×2
Push Flow
C/T
27.9 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
3 / 1d
OEE
82.2%
i
Insert a step here
+
I
32
3.20 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. Sealed Poly Cont…
×3
BOTTLENECK
C/T
48.2 min
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
3 / 1d
OEE
67.7%
i
Insert a step here
+
I
18
1.80 d
Drag to reorder step 3
FIELD OPS
3. Wet Removal & HE…
×3
Push Flow
C/T
37.8 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
2 / 1d
OEE
72.6%
i
Insert a step here
+
I
9
0.90 d
Drag to reorder step 4
CERTIFICATION
4. Clearance Air PC…
×2
FIFO Lane
C/T
31.5 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
2 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
4
0.40 d
Drag to reorder step 5
FM CLOSE
5. Manifested Hazar…
×1
Continuous Flow
C/T
21.6 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
96.0%
i
Insert a step at the end
+
I
4
0.40 d
Finished Goods
OUT
1.50 d
VA 27.9 min
3.20 d
VA 48.2 min
1.80 d
VA 37.8 min
0.90 d
VA 31.5 min
0.40 d
VA 21.6 min
0.40 d
Total Lead Time
8.57 d
VA Time
2.8 h
PCE
4.33%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step