Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Annual Statutory Elevator & Escalator Safety Audit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.27 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.69%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Owner Pit Access & Prep
40 < 65/day
Limit: changeovers
Owner Pit Access & Prep: capacity 40/day vs demand 65/day. Main limit: changeovers. Raw C/T 7.4 min, effective C/T 9.7 min.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€88,110
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Accredited Inspection…
Load Weights & Tachomet…
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
InspectERP
Back-and-Forth RFI Revision
CUSTOMER
Tower Building Owners
65 units/d
Takt: 6.9 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
98
1.51 d
Drag to reorder step 1
INTAKE DESK
1. Statutory 12-Mo …
×2
Push Flow
C/T
4.3 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
20 / 1d
OEE
82.3%
i
Insert a step here
+
I
208
3.20 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. Owner Pit Access…
×3
BOTTLENECK
C/T
7.4 min
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
16 / 1d
OEE
65.8%
i
Insert a step here
+
I
117
1.80 d
Drag to reorder step 3
FIELD OPS
3. Brake, Rope & Sp…
×3
Push Flow
C/T
5.8 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
13 / 1d
OEE
72.6%
i
Insert a step here
+
I
59
0.91 d
Drag to reorder step 4
CERTIFICATION
4. Defect Notice 30…
×2
FIFO Lane
C/T
4.9 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
10 / 1d
OEE
82.2%
i
FIFO
Insert a step here
+
I
26
0.40 d
Drag to reorder step 5
FM CLOSE
5. QR Cab Safety Ce…
×1
Continuous Flow
C/T
3.3 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
87.1%
i
Insert a step at the end
+
I
26
0.40 d
Finished Goods
OUT
1.51 d
VA 4.3 min
3.20 d
VA 7.4 min
1.80 d
VA 5.8 min
0.91 d
VA 4.9 min
0.40 d
VA 3.3 min
0.40 d
Total Lead Time
8.27 d
VA Time
25.7 min
PCE
0.69%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen