Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56.3 min
Lead Time (LT)
8.59 d
Value-Added
3.5 h
Efficiency (PCE)
5.40%
BottleneckSubsidy Grant & CapEx Sign
5 < 8/day
Limit: changeovers
Quality (RTY)
75.2%
WIP Capital
€617,500
Carbon CO₂
1.7 t CO₂e/year