Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial Building Deep Energy & Heat-Pump Retro
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.59 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.40%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Subsidy Grant & CapEx Sign
5 < 8/day
Limit: changeovers
Subsidy Grant & CapEx Sign: capacity 5/day vs demand 8/day. Main limit: changeovers. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€617,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Heat Pump & LED OEMs
BIM Energy Audit & Load…
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
ESG Retrofit CRM
Back-and-Forth RFI Revision
CUSTOMER
Commercial Landlord F…
8 cases/d
Takt: 56.3 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
12
1.50 d
Drag to reorder step 1
INTAKE DESK
1. ASHRAE Level-2 E…
×2
Push Flow
C/T
34.9 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
2 / 1d
OEE
80.9%
i
Insert a step here
+
I
26
3.25 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. Subsidy Grant & …
×3
BOTTLENECK
C/T
1.0 h
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
2 / 1d
OEE
66.0%
i
Insert a step here
+
I
14
1.75 d
Drag to reorder step 3
FIELD OPS
3. Weekend AHU Heat…
×3
Push Flow
C/T
47.3 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
2 / 1d
OEE
75.6%
i
Insert a step here
+
I
7
0.88 d
Drag to reorder step 4
CERTIFICATION
4. Smart Meter & BM…
×2
FIFO Lane
C/T
39.4 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
1 / 1d
OEE
91.3%
i
FIFO
Insert a step here
+
I
3
0.38 d
Drag to reorder step 5
FM CLOSE
5. EPC Grade-A Cert…
×1
Continuous Flow
C/T
27.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
96.0%
i
Insert a step at the end
+
I
3
0.38 d
Finished Goods
OUT
1.50 d
VA 34.9 min
3.25 d
VA 1.0 h
1.75 d
VA 47.3 min
0.88 d
VA 39.4 min
0.38 d
VA 27.0 min
0.38 d
Total Lead Time
8.59 d
VA Time
3.5 h
PCE
5.40%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step