Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Multi-Unit Residential Garage EV Charger Install
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.37 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.46%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Board Approval & Subsidy File
11 < 18/day
Limit: changeovers
Board Approval & Subsidy File: capacity 11/day vs demand 18/day. Main limit: changeovers. Raw C/T 26.8 min, effective C/T 35.1 min.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€213,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
22kW AC Wallboxes & B…
Load-Sharing Gateways
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
ChargeBuild CRM
Back-and-Forth RFI Revision
CUSTOMER
Condo Associations
18 cases/d
Takt: 25.0 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
27
1.50 d
Drag to reorder step 1
INTAKE DESK
1. Transformer Capa…
×2
Push Flow
C/T
15.5 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
5 / 1d
OEE
81.7%
i
Insert a step here
+
I
58
3.22 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. Board Approval &…
×3
BOTTLENECK
C/T
26.8 min
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
5 / 1d
OEE
67.0%
i
Insert a step here
+
I
32
1.78 d
Drag to reorder step 3
FIELD OPS
3. Flat-Busbar Over…
×3
Push Flow
C/T
21.0 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
4 / 1d
OEE
74.1%
i
Insert a step here
+
I
16
0.89 d
Drag to reorder step 4
CERTIFICATION
4. Wallbox Drop & R…
×2
FIFO Lane
C/T
17.5 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
3 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
7
0.39 d
Drag to reorder step 5
FM CLOSE
5. Load-Management …
×1
Continuous Flow
C/T
12.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
87.4%
i
Insert a step at the end
+
I
7
0.39 d
Finished Goods
OUT
1.50 d
VA 15.5 min
3.22 d
VA 26.8 min
1.78 d
VA 21.0 min
0.89 d
VA 17.5 min
0.39 d
VA 12.0 min
0.39 d
Total Lead Time
8.37 d
VA Time
1.5 h
PCE
2.46%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step