Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Drone LiDAR Topographic & Cadastral Land Survey
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
22.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.39 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.21%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
UAV LiDAR / Ortho Capture
12 < 20/day
Limit: changeovers
UAV LiDAR / Ortho Capture: capacity 12/day vs demand 20/day. Main limit: changeovers. Raw C/T 24.1 min, effective C/T 31.6 min.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€95,120
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
RTK Base & UAV LiDAR …
UAV Photogrammetry & Po…
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
GeoSurvey ERP
Back-and-Forth RFI Revision
CUSTOMER
Civil Designers & Dev…
20 cases/d
Takt: 22.5 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
30
1.50 d
Drag to reorder step 1
INTAKE DESK
1. Flight Airspace …
×2
Push Flow
C/T
14.0 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
6 / 1d
OEE
82.2%
i
Insert a step here
+
I
64
3.20 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. UAV LiDAR / Orth…
×3
BOTTLENECK
C/T
24.1 min
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
5 / 1d
OEE
66.0%
i
Insert a step here
+
I
36
1.80 d
Drag to reorder step 3
FIELD OPS
3. Point-Cloud Nois…
×3
Push Flow
C/T
18.9 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
4 / 1d
OEE
72.6%
i
Insert a step here
+
I
18
0.90 d
Drag to reorder step 4
CERTIFICATION
4. CAD Contour & Bo…
×2
FIFO Lane
C/T
15.8 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
3 / 1d
OEE
81.9%
i
FIFO
Insert a step here
+
I
8
0.40 d
Drag to reorder step 5
FM CLOSE
5. GIS Portal GeoTI…
×1
Continuous Flow
C/T
10.8 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
86.3%
i
Insert a step at the end
+
I
8
0.40 d
Finished Goods
OUT
1.50 d
VA 14.0 min
3.20 d
VA 24.1 min
1.80 d
VA 18.9 min
0.90 d
VA 15.8 min
0.40 d
VA 10.8 min
0.40 d
Total Lead Time
8.39 d
VA Time
1.4 h
PCE
2.21%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step