Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Corporate Office Fit-Out Design-Build Handover
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.62 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.6 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
7.17%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Permits & Tender Buy-Out
4 < 6/day
Limit: downtime
Permits & Tender Buy-Out: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 1.3 h, effective C/T 1.8 h.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€307,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
MEP & Acoustic Partit…
Workplace Spec & Landlo…
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
Construction PM Software
Back-and-Forth RFI Revision
CUSTOMER
Corporate Real Estate…
6 cases/d
Takt: 1.3 h
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
9
1.50 d
Drag to reorder step 1
INTAKE DESK
1. Workplace Space …
×2
Push Flow
C/T
46.5 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
2 / 1d
OEE
82.8%
i
Insert a step here
+
I
19
3.17 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. Permits & Tender…
×3
BOTTLENECK
C/T
1.3 h
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
2 / 1d
OEE
68.5%
i
Insert a step here
+
I
11
1.83 d
Drag to reorder step 3
FIELD OPS
3. Partition, Carpe…
×3
Push Flow
C/T
1.1 h
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
1 / 1d
OEE
84.3%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 4
CERTIFICATION
4. Acoustic & BMS S…
×2
FIFO Lane
C/T
52.5 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
1 / 1d
OEE
91.3%
i
FIFO
Insert a step here
+
I
2
0.33 d
Drag to reorder step 5
FM CLOSE
5. Move-In Welcome …
×1
Continuous Flow
C/T
36.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
96.0%
i
Insert a step at the end
+
I
2
0.33 d
Finished Goods
OUT
1.50 d
VA 46.5 min
3.17 d
VA 1.3 h
1.83 d
VA 1.1 h
0.83 d
VA 52.5 min
0.33 d
VA 36.0 min
0.33 d
Total Lead Time
8.62 d
VA Time
4.6 h
PCE
7.17%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen