Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Institutional Portfolio RICS Property Appraisal
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.84%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
On-Site Physical Condition
15 < 24/day
Limit: changeovers
On-Site Physical Condition: capacity 15/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.1 min, effective C/T 26.4 min.
Quality (RTY)
75.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€154,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Comp Market Lease DB
Rent Rolls & CapEx Budg…
Scheduled Trades · LT 3d
PRODUCTION CONTROL / ERP
Valuation Modelling Software
Back-and-Forth RFI Revision
CUSTOMER
Real Estate Private E…
24 files/d
Takt: 18.8 min
EDI / Milestone Sign
MRP / Scheduled Trades
★ PACEMAKER
IN
Insert a step at the start
+
I
36
1.50 d
Drag to reorder step 1
INTAKE DESK
1. Data Room Rent R…
×2
Push Flow
C/T
11.6 min
C/O
10 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
7 / 1d
OEE
82.0%
i
Insert a step here
+
I
77
3.21 d
QUALITY
Automated…
Drag to reorder step 2
CODE REVIEW
2. On-Site Physical…
×3
BOTTLENECK
C/T
20.1 min
C/O
15 min
Availability
86%
Quality FPY
88.5%
Batch / EPEI
6 / 1d
OEE
66.0%
i
Insert a step here
+
I
43
1.79 d
Drag to reorder step 3
FIELD OPS
3. DCF Cashflow Mod…
×3
Push Flow
C/T
15.8 min
C/O
15 min
Availability
91%
Quality FPY
95.8%
Batch / EPEI
5 / 1d
OEE
73.2%
i
Insert a step here
+
I
22
0.92 d
Drag to reorder step 4
CERTIFICATION
4. Peer RICS Review…
×2
FIFO Lane
C/T
13.1 min
C/O
8 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
4 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
10
0.42 d
Drag to reorder step 5
FM CLOSE
5. Signed Valuation…
×1
Continuous Flow
C/T
9.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
84.2%
i
Insert a step at the end
+
I
10
0.42 d
Finished Goods
OUT
1.50 d
VA 11.6 min
3.21 d
VA 20.1 min
1.79 d
VA 15.8 min
0.92 d
VA 13.1 min
0.42 d
VA 9.0 min
0.42 d
Total Lead Time
8.40 d
VA Time
1.2 h
PCE
1.84%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step