Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
18.8 min
Lead Time (LT)
8.40 d
Value-Added
1.2 h
Efficiency (PCE)
1.84%
BottleneckOn-Site Physical Condition
15 < 24/day
Limit: changeovers
Quality (RTY)
75.2%
WIP Capital
€154,440
Carbon CO₂
5.2 t CO₂e/year