Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Whole Blood & Apheresis Donor Center
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.43 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.77%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vein Phlebotomy 450mL Draw
91 < 140/day
Limit: changeovers
Vein Phlebotomy 450mL Draw: capacity 91/day vs demand 140/day. Main limit: changeovers. Raw C/T 3.4 min, effective C/T 4.2 min.
Quality (RTY)
86.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€22,848
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Blood Bags & Snacks
Triple-Bag Collection S…
Weekly Consumables · LT 3d
PRODUCTION CONTROL / ERP
Donor MIS
Paper Chart & Overbooked Slots
CUSTOMER
Regional Blood Testin…
140 patients/d
Takt: 3.2 min
EDI / Scheduled Visits
MRP / Weekly Consumables
★ PACEMAKER
IN
Insert a step at the start
+
I
84
0.60 d
Drag to reorder step 1
INTAKE
1. QR Health Questi…
×2
FIFO Lane
C/T
112 s
C/O
4 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
28 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
98
0.70 d
Drag to reorder step 2
ASSESS POD
2. Fingerstick Hemo…
×3
Push Flow
C/T
2.6 min
C/O
6 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
21 / 1d
OEE
83.6%
i
Insert a step here
+
I
154
1.10 d
AUTOMATION
Ambient A…
Drag to reorder step 3
CARE SUITE
3. Vein Phlebotomy …
×4
BOTTLENECK
C/T
3.4 min
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
21 / 1d
OEE
69.2%
i
Insert a step here
+
I
70
0.50 d
Drag to reorder step 4
CARE PLAN
4. 15-Min Refreshme…
×2
FIFO Lane
C/T
2.4 min
C/O
5 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
14 / 1d
OEE
83.1%
i
FIFO
Insert a step here
+
I
42
0.30 d
Drag to reorder step 5
FOLLOW-UP
5. 4°C Transport Co…
×1
Continuous Flow
C/T
96 s
C/O
3 min
Availability
98%
Quality FPY
99.2%
Batch / EPEI
14 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
28
0.20 d
Finished Goods
OUT
0.60 d
VA 112 s
0.70 d
VA 2.6 min
1.10 d
VA 3.4 min
0.50 d
VA 2.4 min
0.30 d
VA 96 s
0.20 d
Total Lead Time
3.43 d
VA Time
11.9 min
PCE
0.77%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step