Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Supervised Telemetry Phase-II Cardiac Rehab Pod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.49 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
40-Min Monitored Interval Gym
31 < 48/day
Limit: changeovers
40-Min Monitored Interval Gym: capacity 31/day vs demand 48/day. Main limit: changeovers. Raw C/T 10.0 min, effective C/T 12.3 min.
Quality (RTY)
86.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€13,940
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wireless 3-Lead ECG T…
BP Monitors & Ergometers
Weekly Consumables · LT 3d
PRODUCTION CONTROL / ERP
Cardiac Rehab EHR
Paper Chart & Overbooked Slots
CUSTOMER
Post-MI & Bypass Pati…
48 patients/d
Takt: 9.4 min
EDI / Scheduled Visits
MRP / Weekly Consumables
★ PACEMAKER
IN
Insert a step at the start
+
I
29
0.60 d
Drag to reorder step 1
INTAKE
1. Pre-Exercise BP …
×2
FIFO Lane
C/T
5.4 min
C/O
4 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
10 / 1d
OEE
89.6%
i
FIFO
Insert a step here
+
I
34
0.71 d
Drag to reorder step 2
ASSESS POD
2. Wireless Telemet…
×3
Push Flow
C/T
7.5 min
C/O
6 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
7 / 1d
OEE
83.4%
i
Insert a step here
+
I
53
1.10 d
AUTOMATION
Ambient A…
Drag to reorder step 3
CARE SUITE
3. 40-Min Monitored…
×4
BOTTLENECK
C/T
10.0 min
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
7 / 1d
OEE
68.9%
i
Insert a step here
+
I
24
0.50 d
Drag to reorder step 4
CARE PLAN
4. Cool-Down & Lact…
×2
FIFO Lane
C/T
6.9 min
C/O
5 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
5 / 1d
OEE
83.5%
i
FIFO
Insert a step here
+
I
14
0.29 d
Drag to reorder step 5
FOLLOW-UP
5. Weekly Cardiolog…
×1
Continuous Flow
C/T
4.7 min
C/O
3 min
Availability
98%
Quality FPY
99.2%
Batch / EPEI
5 / 1d
OEE
91.0%
i
Insert a step at the end
+
I
10
0.21 d
Finished Goods
OUT
0.60 d
VA 5.4 min
0.71 d
VA 7.5 min
1.10 d
VA 10.0 min
0.50 d
VA 6.9 min
0.29 d
VA 4.7 min
0.21 d
Total Lead Time
3.49 d
VA Time
34.6 min
PCE
2.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step