Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Visiting Home Health Nurse & Wound Route
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.44 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Sterile Negative-Press Wound
59 < 90/day
Limit: changeovers
Sterile Negative-Press Wound: capacity 59/day vs demand 90/day. Main limit: changeovers. Raw C/T 5.4 min, effective C/T 6.6 min.
Quality (RTY)
86.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€29,070
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Central Wound Pack Su…
Tablet EHR & Sterile Dr…
Weekly Consumables · LT 3d
PRODUCTION CONTROL / ERP
Home Care Scheduler
Paper Chart & Overbooked Slots
CUSTOMER
Homebound Seniors
90 patients/d
Takt: 5.0 min
EDI / Scheduled Visits
MRP / Weekly Consumables
★ PACEMAKER
IN
Insert a step at the start
+
I
54
0.60 d
Drag to reorder step 1
INTAKE
1. Route Sequence M…
×2
FIFO Lane
C/T
2.9 min
C/O
4 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
18 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
63
0.70 d
Drag to reorder step 2
ASSESS POD
2. Home Safety & Vi…
×3
Push Flow
C/T
4.0 min
C/O
6 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
14 / 1d
OEE
83.9%
i
Insert a step here
+
I
99
1.10 d
AUTOMATION
Ambient A…
Drag to reorder step 3
CARE SUITE
3. Sterile Negative…
×4
BOTTLENECK
C/T
5.4 min
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
14 / 1d
OEE
69.7%
i
Insert a step here
+
I
45
0.50 d
Drag to reorder step 4
CARE PLAN
4. MD Tele-Consult …
×2
FIFO Lane
C/T
3.7 min
C/O
5 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
9 / 1d
OEE
83.1%
i
FIFO
Insert a step here
+
I
27
0.30 d
Drag to reorder step 5
FOLLOW-UP
5. Evening Sync & N…
×1
Continuous Flow
C/T
2.5 min
C/O
3 min
Availability
98%
Quality FPY
99.2%
Batch / EPEI
9 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
18
0.20 d
Finished Goods
OUT
0.60 d
VA 2.9 min
0.70 d
VA 4.0 min
1.10 d
VA 5.4 min
0.50 d
VA 3.7 min
0.30 d
VA 2.5 min
0.20 d
Total Lead Time
3.44 d
VA Time
18.5 min
PCE
1.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step