Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Post-Hospital Skilled Nursing Home Transition
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.65 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.62%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pharmacist 100% Med Reconcil
12 < 18/day
Limit: changeovers
Pharmacist 100% Med Reconcil: capacity 12/day vs demand 18/day. Main limit: changeovers. Raw C/T 26.8 min, effective C/T 32.9 min.
Quality (RTY)
86.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€29,760
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hospital Discharge Su…
Wound Supplies & Pharma…
Weekly Consumables · LT 3d
PRODUCTION CONTROL / ERP
Skilled Nursing EHR
Paper Chart & Overbooked Slots
CUSTOMER
Skilled Rehab Units
18 patients/d
Takt: 25.0 min
EDI / Scheduled Visits
MRP / Weekly Consumables
★ PACEMAKER
IN
Insert a step at the start
+
I
11
0.61 d
Drag to reorder step 1
INTAKE
1. Bed Hold & Insur…
×2
FIFO Lane
C/T
14.5 min
C/O
4 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
4 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
13
0.72 d
Drag to reorder step 2
ASSESS POD
2. Ambulance Stretc…
×3
Push Flow
C/T
20.0 min
C/O
6 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
84.4%
i
Insert a step here
+
I
20
1.11 d
AUTOMATION
Ambient A…
Drag to reorder step 3
CARE SUITE
3. Pharmacist 100% …
×4
BOTTLENECK
C/T
26.8 min
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
3 / 1d
OEE
70.4%
i
Insert a step here
+
I
9
0.50 d
Drag to reorder step 4
CARE PLAN
4. Fall-Risk & Swal…
×2
FIFO Lane
C/T
18.5 min
C/O
5 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
2 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
5
0.28 d
Drag to reorder step 5
FOLLOW-UP
5. 72-Hr Care Plan …
×1
Continuous Flow
C/T
12.5 min
C/O
3 min
Availability
98%
Quality FPY
99.2%
Batch / EPEI
2 / 1d
OEE
91.4%
i
Insert a step at the end
+
I
4
0.22 d
Finished Goods
OUT
0.61 d
VA 14.5 min
0.72 d
VA 20.0 min
1.11 d
VA 26.8 min
0.50 d
VA 18.5 min
0.28 d
VA 12.5 min
0.22 d
Total Lead Time
3.65 d
VA Time
1.5 h
PCE
5.62%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step