Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Volume Urban Coffee & Morning Pastry Pull
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
35 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Warm Convection Pastry Pull
523 < 780/day
Limit: changeovers
Warm Convection Pastry Pull: capacity 523/day vs demand 780/day. Main limit: changeovers. Raw C/T 37 s, effective C/T 45 s.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€27,144
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Local Roastery & Bake…
Milk, Beans & Bake-Off …
Daily Night Drop · LT 2d
PRODUCTION CONTROL / ERP
CafePOS + KDS
Daily Min-Max Morning Push
CUSTOMER
Morning Commuters
780 orders/d
Takt: 35 s
EDI / Continuous Store
MRP / Daily Night Drop
★ PACEMAKER
IN
Insert a step at the start
+
I
1,092
1.40 d
Drag to reorder step 1
STOCKROOM
1. App Pre-Order & …
×2
Push Flow
C/T
22 s
C/O
10 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
390 / 1d
OEE
89.5%
i
Insert a step here
+
I
1,326
1.70 d
Drag to reorder step 2
SALES FLOOR
2. Double-Shot Espr…
×4
Push Flow
C/T
28 s
C/O
8 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
312 / 1d
OEE
86.6%
i
Insert a step here
+
I
936
1.20 d
KANBAN
Dark Micr…
Drag to reorder step 3
OMNI DESK
3. Warm Convection …
×3
BOTTLENECK
C/T
37 s
C/O
12 min
Availability
88%
Quality FPY
94.0%
Batch / EPEI
156 / 1d
OEE
71.7%
i
Insert a step here
+
I
468
0.60 d
Drag to reorder step 4
POS BENCH
4. Lid, Sleeve & Cu…
×2
FIFO Lane
C/T
24 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
78 / 1d
OEE
84.3%
i
FIFO
Insert a step here
+
I
312
0.40 d
Drag to reorder step 5
FRONT DESK
5. Mobile Pickup Co…
×2
Continuous Flow
C/T
18 s
C/O
3 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
78 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
546
0.70 d
Finished Goods
OUT
1.40 d
VA 22 s
1.70 d
VA 28 s
1.20 d
VA 37 s
0.60 d
VA 24 s
0.40 d
VA 18 s
0.70 d
Total Lead Time
6.00 d
VA Time
2.2 min
PCE
0.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step