Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
87 s
Lead Time (LT)
6.01 d
Value-Added
5.4 min
Efficiency (PCE)
0.10%
BottleneckTamper Sticker & Thermal Bag
448 < 620/day
Limit: downtime
Quality (RTY)
88.7%
WIP Capital
€59,520
Carbon CO₂
13.5 t CO₂e/year