Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
DIY Home Center Drive-Thru Timber & Pallet Bay
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
79 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.01 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Drive-Thru Van Roof Load
228 < 340/day
Limit: changeovers
Drive-Thru Van Roof Load: capacity 228/day vs demand 340/day. Main limit: changeovers. Raw C/T 85 s, effective C/T 103 s.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€138,720
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Sawmill & Cement Supp…
Studs, Gypsum & Bags
Daily Night Drop · LT 2d
PRODUCTION CONTROL / ERP
DIY Store ERP
Daily Min-Max Morning Push
CUSTOMER
Tradesmen & DIY Shopp…
340 orders/d
Takt: 79 s
EDI / Continuous Store
MRP / Daily Night Drop
★ PACEMAKER
IN
Insert a step at the start
+
I
476
1.40 d
Drag to reorder step 1
STOCKROOM
1. Overnight Yard F…
×2
Push Flow
C/T
51 s
C/O
10 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
170 / 1d
OEE
89.5%
i
Insert a step here
+
I
578
1.70 d
Drag to reorder step 2
SALES FLOOR
2. Contractor App P…
×4
Push Flow
C/T
64 s
C/O
8 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
136 / 1d
OEE
86.6%
i
Insert a step here
+
I
408
1.20 d
KANBAN
Dark Micr…
Drag to reorder step 3
OMNI DESK
3. Drive-Thru Van R…
×3
BOTTLENECK
C/T
85 s
C/O
12 min
Availability
88%
Quality FPY
94.0%
Batch / EPEI
68 / 1d
OEE
71.7%
i
Insert a step here
+
I
204
0.60 d
Drag to reorder step 4
POS BENCH
4. Barcode Forklift…
×2
FIFO Lane
C/T
56 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
34 / 1d
OEE
84.3%
i
FIFO
Insert a step here
+
I
136
0.40 d
Drag to reorder step 5
FRONT DESK
5. License Plate Ga…
×2
Continuous Flow
C/T
41 s
C/O
3 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
34 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
238
0.70 d
Finished Goods
OUT
1.40 d
VA 51 s
1.70 d
VA 64 s
1.20 d
VA 85 s
0.60 d
VA 56 s
0.40 d
VA 41 s
0.70 d
Total Lead Time
6.01 d
VA Time
5.0 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step