Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Luxury Fashion Boutique Clienteling & Tailoring
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.05 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
17.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.65%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
In-House Master Pin Alteration
64 < 95/day
Limit: changeovers
In-House Master Pin Alteration: capacity 64/day vs demand 95/day. Main limit: changeovers. Raw C/T 5.1 min, effective C/T 6.1 min.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€274,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Atelier Milan/Paris D…
Numbered Garments & Bags
Daily Night Drop · LT 2d
PRODUCTION CONTROL / ERP
Clienteling ERP
Daily Min-Max Morning Push
CUSTOMER
VIP Appointment Shopp…
95 orders/d
Takt: 4.7 min
EDI / Continuous Store
MRP / Daily Night Drop
★ PACEMAKER
IN
Insert a step at the start
+
I
133
1.40 d
Drag to reorder step 1
STOCKROOM
1. RFID Vault Reser…
×2
Push Flow
C/T
3.0 min
C/O
10 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
48 / 1d
OEE
89.6%
i
Insert a step here
+
I
162
1.71 d
Drag to reorder step 2
SALES FLOOR
2. Private Styling …
×4
Push Flow
C/T
3.8 min
C/O
8 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
38 / 1d
OEE
86.6%
i
Insert a step here
+
I
114
1.20 d
KANBAN
Dark Micr…
Drag to reorder step 3
OMNI DESK
3. In-House Master …
×3
BOTTLENECK
C/T
5.1 min
C/O
12 min
Availability
88%
Quality FPY
94.0%
Batch / EPEI
19 / 1d
OEE
71.7%
i
Insert a step here
+
I
57
0.60 d
Drag to reorder step 4
POS BENCH
4. Steam Press & Mo…
×2
FIFO Lane
C/T
3.3 min
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
10 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
38
0.40 d
Drag to reorder step 5
FRONT DESK
5. White-Glove Hote…
×2
Continuous Flow
C/T
2.5 min
C/O
3 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
10 / 1d
OEE
91.2%
i
Insert a step at the end
+
I
67
0.71 d
Finished Goods
OUT
1.40 d
VA 3.0 min
1.71 d
VA 3.8 min
1.20 d
VA 5.1 min
0.60 d
VA 3.3 min
0.40 d
VA 2.5 min
0.71 d
Total Lead Time
6.05 d
VA Time
17.7 min
PCE
0.65%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step