Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56 s
Lead Time (LT)
8.91 d
Value-Added
3.6 min
Efficiency (PCE)
0.09%
BottleneckSafety Earth & Leakage Bench
313 < 480/day
Limit: downtime
Quality (RTY)
85.4%
WIP Capital
€119,616
Carbon CO₂
31.5 t CO₂e/year