Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
40.9 min
Lead Time (LT)
9.13 d
Value-Added
2.6 h
Efficiency (PCE)
1.92%
BottleneckEddy-Current & Electrostatic Sep
15 < 22/day
Limit: downtime
Quality (RTY)
85.4%
WIP Capital
€374,300
Carbon CO₂
1.4 t CO₂e/year