Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
18.8 min
Lead Time (LT)
9.08 d
Value-Added
1.2 h
Efficiency (PCE)
1.77%
BottleneckCell-Swap Capacity Balancing
16 < 24/day
Limit: downtime
Quality (RTY)
85.4%
WIP Capital
€310,300
Carbon CO₂
1.6 t CO₂e/year