Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Laser Printer Toner Cartridge Remanufacturing
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
116 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
New OPC Drum & Doctor Blade
1,237 < 1,800/day
Limit: downtime
New OPC Drum & Doctor Blade: capacity 1,237/day vs demand 1,800/day. Main limit: downtime. Raw C/T 32 s, effective C/T 42 s.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€256,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
118.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Office Collection Box…
Empty Laser Toner Shells
Daily Customer RMA · LT 2d
PRODUCTION CONTROL / ERP
RemanERP
Unsorted Return Pile Push
CUSTOMER
Corporate Managed Pri…
1,800 units/d
Takt: 30 s
EDI / Daily Marketplace
MRP / Daily Customer RMA
★ PACEMAKER
IN
Insert a step at the start
+
I
2,880
1.60 d
Drag to reorder step 1
RMA DOCK
1. Chip Reset & Spl…
×3
FIFO Lane
C/T
20 s
C/O
12 min
Availability
95%
Quality FPY
98.1%
Batch / EPEI
900 / 1d
OEE
90.7%
i
FIFO
Insert a step here
+
I
3,240
1.80 d
Drag to reorder step 2
GRADE BENCH
2. Vacuum Waste Hop…
×3
Push Flow
C/T
24 s
C/O
15 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
720 / 1d
OEE
85.0%
i
Insert a step here
+
I
4,320
2.40 d
FLOW
Triage Di…
Drag to reorder step 3
REFURB LAB
3. New OPC Drum & D…
×4
BOTTLENECK
C/T
32 s
C/O
20 min
Availability
84%
Quality FPY
92.5%
Batch / EPEI
900 / 1d
OEE
74.2%
i
Insert a step here
+
I
1,620
0.90 d
Drag to reorder step 4
QC BENCH
4. Gravimetric Poly…
×2
FIFO Lane
C/T
22 s
C/O
8 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
450 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
1,440
0.80 d
Drag to reorder step 5
CIRCULAR OUT
5. 10-Page Print De…
×2
Continuous Flow
C/T
17 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
450 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
2,520
1.40 d
Finished Goods
OUT
1.60 d
VA 20 s
1.80 d
VA 24 s
2.40 d
VA 32 s
0.90 d
VA 22 s
0.80 d
VA 17 s
1.40 d
Total Lead Time
8.90 d
VA Time
116 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step