Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Decommissioned Fiberglass Wind Blade Cement Co-Feed
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.32 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.45%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hammer Mill Controlled Fiber
8 < 12/day
Limit: downtime
Hammer Mill Controlled Fiber: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 40.5 min, effective C/T 52.1 min.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€73,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Repowered Wind Farms
80m Cut Glass/Epoxy Sec…
Daily Customer RMA · LT 2d
PRODUCTION CONTROL / ERP
GreenLoop ERP
Unsorted Return Pile Push
CUSTOMER
Cement Kiln & Panel M…
12 tonnes/d
Takt: 37.5 min
EDI / Daily Marketplace
MRP / Daily Customer RMA
★ PACEMAKER
IN
Insert a step at the start
+
I
19
1.58 d
Drag to reorder step 1
RMA DOCK
1. Diamond Wire Sec…
×3
FIFO Lane
C/T
25.5 min
C/O
12 min
Availability
95%
Quality FPY
98.1%
Batch / EPEI
6 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
GRADE BENCH
2. Primary Shredder…
×3
Push Flow
C/T
30.0 min
C/O
15 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
5 / 1d
OEE
81.6%
i
Insert a step here
+
I
29
2.42 d
FLOW
Triage Di…
Drag to reorder step 3
REFURB LAB
3. Hammer Mill Cont…
×4
BOTTLENECK
C/T
40.5 min
C/O
20 min
Availability
84%
Quality FPY
92.5%
Batch / EPEI
6 / 1d
OEE
70.8%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 4
QC BENCH
4. Calorific Value …
×2
FIFO Lane
C/T
27.8 min
C/O
8 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
3 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
10
0.83 d
Drag to reorder step 5
CIRCULAR OUT
5. Bulk Silo Truck …
×2
Continuous Flow
C/T
21.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
3 / 1d
OEE
89.6%
i
Insert a step at the end
+
I
17
1.42 d
Finished Goods
OUT
1.58 d
VA 25.5 min
1.83 d
VA 30.0 min
2.42 d
VA 40.5 min
0.92 d
VA 27.8 min
0.83 d
VA 21.0 min
1.42 d
Total Lead Time
9.32 d
VA Time
2.4 h
PCE
3.45%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step