Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous Multi-Language SaaS L10n Release
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.96 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.62%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Machine + Native Context Trans
54 < 85/day
Limit: downtime
Machine + Native Context Trans: capacity 54/day vs demand 85/day. Main limit: downtime. Raw C/T 5.7 min, effective C/T 7.4 min.
Quality (RTY)
80.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€30,576
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Product Git String Ke…
English ICU JSON Resour…
Continuous CRM · LT 2d
PRODUCTION CONTROL / ERP
L10n Platform + CI
Customer Data Wait Bottleneck
CUSTOMER
Global Regional Users
85 tickets/d
Takt: 5.3 min
EDI / Tenant Go-Live
MRP / Continuous CRM
★ PACEMAKER
IN
Insert a step at the start
+
I
68
0.80 d
Drag to reorder step 1
PROVISIONING
1. PR Auto-Push New…
×2
FIFO Lane
C/T
3.1 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
17 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
238
2.80 d
AUTOMATION
Self-Serv…
Drag to reorder step 2
SOLUTIONS ENG
2. Machine + Native…
×3
BOTTLENECK
C/T
5.7 min
C/O
15 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
26 / 1d
OEE
68.6%
i
Insert a step here
+
I
136
1.60 d
Drag to reorder step 3
CUSTOMER SUCCESS
3. Pseudo-Locale RT…
×3
Push Flow
C/T
4.3 min
C/O
10 min
Availability
93%
Quality FPY
95.8%
Batch / EPEI
17 / 1d
OEE
79.2%
i
Insert a step here
+
I
77
0.91 d
Drag to reorder step 4
QA/SECURITY
4. Linguistic Revie…
×2
FIFO Lane
C/T
3.8 min
C/O
6 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
13 / 1d
OEE
84.6%
i
FIFO
Insert a step here
+
I
43
0.51 d
Drag to reorder step 5
ACCOUNT CS
5. Auto PR Merge Be…
×2
Continuous Flow
C/T
2.7 min
C/O
3 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
91.0%
i
Insert a step at the end
+
I
26
0.31 d
Finished Goods
OUT
0.80 d
VA 3.1 min
2.80 d
VA 5.7 min
1.60 d
VA 4.3 min
0.91 d
VA 3.8 min
0.51 d
VA 2.7 min
0.31 d
Total Lead Time
6.96 d
VA Time
19.5 min
PCE
0.62%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step