Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Annual External Gray-Box Application Pen-Test
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.21 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.40%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
2-Week Manual Exploit Hunt
5 < 8/day
Limit: changeovers
2-Week Manual Exploit Hunt: capacity 5/day vs demand 8/day. Main limit: changeovers. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
80.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€105,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
CREST Ethical Hackers
Staging App & API Docs
Continuous CRM · LT 2d
PRODUCTION CONTROL / ERP
Bug Bounty / Issue Tracker
Customer Data Wait Bottleneck
CUSTOMER
Enterprise Compliance
8 cases/d
Takt: 56.3 min
EDI / Tenant Go-Live
MRP / Continuous CRM
★ PACEMAKER
IN
Insert a step at the start
+
I
6
0.75 d
Drag to reorder step 1
PROVISIONING
1. Scope Lock & Tes…
×2
FIFO Lane
C/T
32.6 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
2 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
22
2.75 d
AUTOMATION
Self-Serv…
Drag to reorder step 2
SOLUTIONS ENG
2. 2-Week Manual Ex…
×3
BOTTLENECK
C/T
1.0 h
C/O
15 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
2 / 1d
OEE
66.7%
i
Insert a step here
+
I
13
1.63 d
Drag to reorder step 3
CUSTOMER SUCCESS
3. Critical/High Tr…
×3
Push Flow
C/T
46.1 min
C/O
10 min
Availability
93%
Quality FPY
95.8%
Batch / EPEI
2 / 1d
OEE
81.2%
i
Insert a step here
+
I
7
0.88 d
Drag to reorder step 4
QA/SECURITY
4. Independent Rete…
×2
FIFO Lane
C/T
40.5 min
C/O
6 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
91.5%
i
FIFO
Insert a step here
+
I
4
0.50 d
Drag to reorder step 5
ACCOUNT CS
5. Clean Attestatio…
×2
Continuous Flow
C/T
28.1 min
C/O
3 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
96.5%
i
Insert a step at the end
+
I
2
0.25 d
Finished Goods
OUT
0.75 d
VA 32.6 min
2.75 d
VA 1.0 h
1.63 d
VA 46.1 min
0.88 d
VA 40.5 min
0.50 d
VA 28.1 min
0.25 d
Total Lead Time
7.21 d
VA Time
3.5 h
PCE
6.40%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step