Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enterprise InfoSec Vendor Questionnaire (SIG/VSA)
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.97 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
43.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
85% Knowledge Base Fill
24 < 38/day
Limit: changeovers
85% Knowledge Base Fill: capacity 24/day vs demand 38/day. Main limit: changeovers. Raw C/T 12.7 min, effective C/T 16.5 min.
Quality (RTY)
80.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€50,895
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Procurement InfoSec T…
300-Question Excel Surv…
Continuous CRM · LT 2d
PRODUCTION CONTROL / ERP
Security Questionnaire Platform
Customer Data Wait Bottleneck
CUSTOMER
Enterprise Deal Desk
38 files/d
Takt: 11.8 min
EDI / Tenant Go-Live
MRP / Continuous CRM
★ PACEMAKER
IN
Insert a step at the start
+
I
30
0.79 d
Drag to reorder step 1
PROVISIONING
1. Spreadsheet Auto…
×2
FIFO Lane
C/T
6.9 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
8 / 1d
OEE
88.7%
i
FIFO
Insert a step here
+
I
106
2.79 d
AUTOMATION
Self-Serv…
Drag to reorder step 2
SOLUTIONS ENG
2. 85% Knowledge Ba…
×3
BOTTLENECK
C/T
12.7 min
C/O
15 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
11 / 1d
OEE
68.1%
i
Insert a step here
+
I
61
1.61 d
Drag to reorder step 3
CUSTOMER SUCCESS
3. Custom Architect…
×3
Push Flow
C/T
9.7 min
C/O
10 min
Availability
93%
Quality FPY
95.8%
Batch / EPEI
8 / 1d
OEE
79.7%
i
Insert a step here
+
I
34
0.89 d
Drag to reorder step 4
QA/SECURITY
4. CISO Final Attes…
×2
FIFO Lane
C/T
8.5 min
C/O
6 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
84.9%
i
FIFO
Insert a step here
+
I
19
0.50 d
Drag to reorder step 5
ACCOUNT CS
5. Trust Center Vau…
×2
Continuous Flow
C/T
5.9 min
C/O
3 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
91.0%
i
Insert a step at the end
+
I
11
0.29 d
Finished Goods
OUT
0.79 d
VA 6.9 min
2.79 d
VA 12.7 min
1.61 d
VA 9.7 min
0.89 d
VA 8.5 min
0.50 d
VA 5.9 min
0.29 d
Total Lead Time
6.97 d
VA Time
43.7 min
PCE
1.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step