Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
SaaS Usage-Based Metering & Overage Billing Run
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.93 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Tiered Volume Rate Rating
77 < 120/day
Limit: downtime
Tiered Volume Rate Rating: capacity 77/day vs demand 120/day. Main limit: downtime. Raw C/T 4.0 min, effective C/T 5.2 min.
Quality (RTY)
80.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€70,380
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
9.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
API Gateway Usage Eve…
Customer Token & Seat C…
Continuous CRM · LT 2d
PRODUCTION CONTROL / ERP
Payment Billing
Customer Data Wait Bottleneck
CUSTOMER
FinTech / AI SaaS Buy…
120 batches/d
Takt: 3.8 min
EDI / Tenant Go-Live
MRP / Continuous CRM
★ PACEMAKER
IN
Insert a step at the start
+
I
96
0.80 d
Drag to reorder step 1
PROVISIONING
1. Real-Time Event …
×2
FIFO Lane
C/T
2.2 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
24 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
336
2.80 d
AUTOMATION
Self-Serv…
Drag to reorder step 2
SOLUTIONS ENG
2. Tiered Volume Ra…
×3
BOTTLENECK
C/T
4.0 min
C/O
15 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
36 / 1d
OEE
68.4%
i
Insert a step here
+
I
192
1.60 d
Drag to reorder step 3
CUSTOMER SUCCESS
3. Anomaly Spike Fr…
×3
Push Flow
C/T
3.1 min
C/O
10 min
Availability
93%
Quality FPY
95.8%
Batch / EPEI
24 / 1d
OEE
79.2%
i
Insert a step here
+
I
108
0.90 d
Drag to reorder step 4
QA/SECURITY
4. Draft Invoice Pr…
×2
FIFO Lane
C/T
2.7 min
C/O
6 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
84.5%
i
FIFO
Insert a step here
+
I
60
0.50 d
Drag to reorder step 5
ACCOUNT CS
5. Auto Card / ACH …
×2
Continuous Flow
C/T
113 s
C/O
3 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
12 / 1d
OEE
90.6%
i
Insert a step at the end
+
I
36
0.30 d
Finished Goods
OUT
0.80 d
VA 2.2 min
2.80 d
VA 4.0 min
1.60 d
VA 3.1 min
0.90 d
VA 2.7 min
0.50 d
VA 113 s
0.30 d
Total Lead Time
6.93 d
VA Time
13.9 min
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step