Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Inland River Double-Hull Hopper Cargo Barge
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
11.28%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Sectional Weld & Vacuum Test
2 < 3/day
Limit: downtime
Sectional Weld & Vacuum Test: capacity 2/day vs demand 3/day. Main limit: downtime. Raw C/T 2.7 h, effective C/T 3.4 h.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€868,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
23.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Shot-Blasted Steel Co…
Standardized Mid-Body M…
Weekly Steel Barge · LT 10d
PRODUCTION CONTROL / ERP
ShipERP
Drydock Critical Block Hold
CUSTOMER
Rhine & Mississippi F…
3 units/d
Takt: 2.5 h
EDI / Block Crane Slot
MRP / Weekly Steel Barge
★ PACEMAKER
IN
Insert a step at the start
+
I
6
2.00 d
Drag to reorder step 1
PLATE LINE
1. Batch Laser Nest…
×3
Push Flow
C/T
1.7 h
C/O
30 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
5 / 2d
OEE
90.3%
i
Insert a step here
+
I
5
1.67 d
Drag to reorder step 2
PANEL HALL
2. Automated Fillet…
×4
Push Flow
C/T
2.0 h
C/O
35 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
3 / 2d
OEE
82.8%
i
Insert a step here
+
I
8
2.67 d
FLOW
Pre-Outfi…
Drag to reorder step 3
BLOCK SHOP
3. Sectional Weld &…
×6
BOTTLENECK
C/T
2.7 h
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
3 / 2d
OEE
72.1%
i
Insert a step here
+
I
4
1.33 d
Drag to reorder step 4
PAINT CELL
4. Hatch Covers & W…
×3
Push Flow
C/T
2.0 h
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
2 / 2d
OEE
82.5%
i
Insert a step here
+
I
3
1.00 d
Drag to reorder step 5
DRYDOCK
5. Slipway Launch &…
×5
FIFO Lane
C/T
1.6 h
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
2 / 1d
OEE
89.3%
i
Insert a step at the end
+
I
5
1.67 d
Finished Goods
OUT
2.00 d
VA 1.7 h
1.67 d
VA 2.0 h
2.67 d
VA 2.7 h
1.33 d
VA 2.0 h
1.00 d
VA 1.6 h
1.67 d
Total Lead Time
11.6 d
VA Time
9.9 h
PCE
11.28%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step