Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
7.5 h
Lead Time (LT)
14.9 d
Value-Added
29.6 h
Efficiency (PCE)
26.37%
BottleneckHeavy Strand-Jack Hoist Lift
1 < 1/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€1,540,000
Carbon CO₂
7.7 t CO₂e/year