Cutter-Suction Harbor Dredger Cutterhead Rebuild
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.8 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Chromium Carbide Hardfacing
4 < 6/day
Limit: downtime
Chromium Carbide Hardfacing: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€579,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
45.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wear Adapters & Cobal…
CrMo Cast Crown Rings
Weekly Steel Barge · LT 10d
PRODUCTION CONTROL / ERP
WearShop ERP
Drydock Critical Block Hold
CUSTOMER
Dredging Marine Contr…
6 assemblies/d
Takt: 1.3 h
EDI / Block Crane Slot
MRP / Weekly Steel Barge
★ PACEMAKER
IN
Insert a step at the start
+
I
11
1.83 d
Drag to reorder step 1
PLATE LINE
1. Arc-Air Gouge Wo…
×3
Push Flow
C/T
49.5 min
C/O
30 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
9 / 2d
OEE
89.9%
i
Insert a step here
+
I
11
1.83 d
Drag to reorder step 2
PANEL HALL
2. Pre-Heat Weld Ne…
×4
Push Flow
C/T
1.0 h
C/O
35 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
6 / 2d
OEE
82.8%
i
Insert a step here
+
I
16
2.67 d
FLOW
Pre-Outfi…
Drag to reorder step 3
BLOCK SHOP
3. Chromium Carbide…
×6
BOTTLENECK
C/T
1.4 h
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
6 / 2d
OEE
72.1%
i
Insert a step here
+
I
8
1.33 d
Drag to reorder step 4
PAINT CELL
4. 5-Axis Shaft Tap…
×3
Push Flow
C/T
58.5 min
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
5 / 2d
OEE
84.0%
i
Insert a step here
+
I
6
1.00 d
Drag to reorder step 5
DRYDOCK
5. Dynamic Balance …
×5
FIFO Lane
C/T
46.5 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
3 / 1d
OEE
87.7%
i
Insert a step at the end
+
I
9
1.50 d
Finished Goods
OUT
1.83 d
VA 49.5 min
1.83 d
VA 1.0 h
2.67 d
VA 1.4 h
1.33 d
VA 58.5 min
1.00 d
VA 46.5 min
1.50 d
Total Lead Time
10.8 d
VA Time
4.9 h
PCE
6.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step