Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
11.3 h
Lead Time (LT)
12.5 d
Value-Added
44.3 h
Efficiency (PCE)
15.80%
BottleneckSpot Epoxy Primer Stripe
1 < 2/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€588,000
Carbon CO₂
15.3 t CO₂e/year