Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Intermodal 90ft Articulated Rail Container Wagon
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.1 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.68%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Shot-Blast & Dual-Coat Epoxy
10 < 14/day
Limit: downtime
Shot-Blast & Dual-Coat Epoxy: capacity 10/day vs demand 14/day. Main limit: downtime. Raw C/T 1.2 h, effective C/T 1.4 h.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,644,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
107.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Y25 Bogies & Steel Pr…
High-Tensile S460 Frames
Weekly Steel Barge · LT 10d
PRODUCTION CONTROL / ERP
Heavy Industry ERP
Drydock Critical Block Hold
CUSTOMER
European Rail Lessors
14 units/d
Takt: 1.1 h
EDI / Block Crane Slot
MRP / Weekly Steel Barge
★ PACEMAKER
IN
Insert a step at the start
+
I
27
1.93 d
Drag to reorder step 1
PLATE LINE
1. Camber Jig Spine…
×3
Push Flow
C/T
42.4 min
C/O
30 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
21 / 2d
OEE
92.0%
i
Insert a step here
+
I
25
1.79 d
Drag to reorder step 2
PANEL HALL
2. UT Critical Fati…
×4
Push Flow
C/T
51.4 min
C/O
35 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
14 / 2d
OEE
86.3%
i
Insert a step here
+
I
36
2.57 d
FLOW
Pre-Outfi…
Drag to reorder step 3
BLOCK SHOP
3. Shot-Blast & Dua…
×6
BOTTLENECK
C/T
1.2 h
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
14 / 2d
OEE
76.1%
i
Insert a step here
+
I
20
1.43 d
Drag to reorder step 4
PAINT CELL
4. Y25 Bogie & UIC …
×3
Push Flow
C/T
50.2 min
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
11 / 2d
OEE
86.8%
i
Insert a step here
+
I
14
1.00 d
Drag to reorder step 5
DRYDOCK
5. Static Buff & Tw…
×5
FIFO Lane
C/T
39.9 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
7 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
1.93 d
VA 42.4 min
1.79 d
VA 51.4 min
2.57 d
VA 1.2 h
1.43 d
VA 50.2 min
1.00 d
VA 39.9 min
1.50 d
Total Lead Time
10.5 d
VA Time
4.2 h
PCE
2.68%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step