Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.0 h
Lead Time (LT)
11.6 d
Value-Added
19.7 h
Efficiency (PCE)
11.28%
BottleneckPipe Spool & Cable Pre-Outfit
2 < 3/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€1,302,000
Carbon CO₂
23.0 t CO₂e/year